I stumbled onto concise but comprehensive article by Chris Dixon in Walls & Ceilings magazine called Straight Green: Alternative VOC Calculation for LEED. Basically, it walks you through the process of preparing a VOC budget (what you need to do if the contractor slips in a non-compliant paint or adhesive) as an alternative compliance measure for achieving EQc4, Low Emitting Materials credits. I could go into more detail, but instead I'll just recommend reading the article for yourself!

VOC Budget Example
This article was published in 2008, and references LEED-NCv2.2 standards, though my understanding is that the methodology should not have changed in the 2009 edition of the same system, and that it should also apply to LEED-CI, LEED-CS, and LEED-Schools systems.
No comments:
Post a Comment
Though Real Life LEED reserves the right to remove any and all comments at any time, in general I only remove posts if:
1. I feel like you're trying to sell more than trying to help. I don't mind if you share some website or product you own or market if it genuinely adds to the discussion. (19 posts removed so far)
2. You're posting as someone other than yourself. (0 posts removed so far)
3. You're post is in poor taste (racist, sexist, bullyish, etc.) as defined by me, Real Life LEED. (0 posts removed so far)
Note: Only a member of this blog may post a comment.